    "id": "coreweave-crawley-lgw16-us-mega-clusters",
    "project_name": "Crawley LGW16 & US Mega-Clusters",
    "company_name": "CoreWeave",
    "company_id": "coreweave",
    "operational_phase": "Operational",
    "energized_mw": 550.0,
    "energized_raw": "550 MW (50 MW UK, 500 MW US)",
    "speculative_mw": 1000.0,
    "speculative_raw": "1,000+ MW non-binding pipeline",
    "regulatory_dockets": [
      "UKPN DNO Interconnect",
      "Planning Permission CR/2025/0122/FUL"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Michael Intrator (CEO)",
      "Sachin Jain (COO)"
    ],
    "delivery_operators": [
      "Brian Venturo (CTO)",
      "Chen Goldberg (EVP Eng)",
      "Ben Richardson (MD Intl)"
    ]
  },
  {
    "id": "crusoe-energy-lancium-clean-campus-abilene",
    "project_name": "Lancium Clean Campus Abilene",
    "company_name": "Crusoe Cloud",
    "company_id": "crusoe-cloud",
    "operational_phase": "Commissioning / Active",
    "energized_mw": 206.0,
    "energized_raw": "206 MW (Phase 1)",
    "speculative_mw": 1000.0,
    "speculative_raw": "1,000 MW speculative master plan",
    "regulatory_dockets": [
      "PUCT Docket No. 55999",
      "ERCOT Large Flexible Load Queue"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Chase Lochmiller (CEO)",
      "Cully Cavness (COO)"
    ],
    "delivery_operators": [
      "Patrick McGinn (VP DC Ops)"
    ]
  },
  {
    "id": "helix-digital-infrastructure-greenfields-platform-assembly",
    "project_name": "Greenfields (Platform Assembly)",
    "company_name": "Helix Digital Infrastructure",
    "company_id": "helix-digital-infrastructure",
    "operational_phase": "Pre-construction / Planning",
    "energized_mw": 0.0,
    "energized_raw": "0 MW",
    "speculative_mw": 0.0,
    "speculative_raw": "$10B private equity target",
    "regulatory_dockets": [
      "KKR SEC Form ADV Part 2A",
      "Delaware Entity 10188924"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Adam Selipsky (CEO)",
      "Waldemar Szlezak (CIO)"
    ],
    "delivery_operators": [
      "Jonathan Lin (EVP DC Strat)",
      "Kleber Costa (EVP Power)"
    ]
  },
  {
    "id": "crux-ai-infrastructure-project-alpha-tpu-campus",
    "project_name": "Project Alpha TPU Campus",
    "company_name": "Crux AI",
    "company_id": "crux-ai",
    "operational_phase": "Design / Pre-construction",
    "energized_mw": 0.0,
    "energized_raw": "0 MW",
    "speculative_mw": 500.0,
    "speculative_raw": "500 MW speculative target ($22B unverified debt)",
    "regulatory_dockets": [
      "Delaware File 10244812",
      "Google Cloud Lease Indenture"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Benjamin Treynor Sloss (CEO)"
    ],
    "delivery_operators": [
      "Alan Duong (CDO)"
    ]
  },
  {
    "id": "meta-compute-east-el-paso-hyperscale-campus",
    "project_name": "East El Paso Hyperscale Campus",
    "company_name": "Meta Compute",
    "company_id": "meta-compute",
    "operational_phase": "Under Construction (Phase 1)",
    "energized_mw": 440.0,
    "energized_raw": "440 MW (Contracted IT load)",
    "speculative_mw": 1000.0,
    "speculative_raw": "560 MW expansion (to 1 GW total vision)",
    "regulatory_dockets": [
      "PUCT Docket No. 59076",
      "El Paso City Chapter 380 Agreement"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Santosh Janardhan (Co-Lead)",
      "Daniel Gross (Co-Lead)"
    ],
    "delivery_operators": [
      "Rachel Peterson (VP DC Strat)",
      "Dina Powell McCormick (Pres)"
    ]
  },
  {
    "id": "nscale-nordscale-narvik-ai-campus-skoglund",
    "project_name": "Narvik AI Campus (Skoglund)",
    "company_name": "Nscale Global Holdings Ltd.",
    "company_id": "nscale-global-holdings-ltd",
    "operational_phase": "Operational / Scaling",
    "energized_mw": 230.0,
    "energized_raw": "230 MW (Sub-station allocation)",
    "speculative_mw": 300.0,
    "speculative_raw": "300 MW Nordic pipeline",
    "regulatory_dockets": [
      "NVE Anleggskonsesjon 202504821-6",
      "Vattenfall PPA"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Josh Payne (CEO)",
      "Stian Jenssen (Chair Nordscale)"
    ],
    "delivery_operators": [
      "David Power (CTO)",
      "Sam Huckaby (Pres DC)"
    ]
  },
  {
    "id": "nebius-group-m\u00e4nts\u00e4l\u00e4-ai-infrastructure-campus",
    "project_name": "M\u00e4nts\u00e4l\u00e4 AI Infrastructure Campus",
    "company_name": "Nebius Group N.V.",
    "company_id": "nebius-group-nv",
    "operational_phase": "Operational",
    "energized_mw": 75.0,
    "energized_raw": "75 MW (Connected IT load)",
    "speculative_mw": 125.0,
    "speculative_raw": "125 MW European pipeline",
    "regulatory_dockets": [
      "Finnish AVI Permit ESAVI/14298/2023",
      "Nivos Oy Contract"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Arkady Volozh (CEO)"
    ],
    "delivery_operators": [
      "Andrey Korolenko (Infra Lead)",
      "Mikhail Mokrushin (Arch)",
      "Juuso Vesanen (Site Dir)"
    ]
  },
  {
    "id": "groq-groqcloud-distributed-lpu-colocation-fleet",
    "project_name": "Distributed LPU Colocation Fleet",
    "company_name": "Groq",
    "company_id": "groq",
    "operational_phase": "Operational",
    "energized_mw": 12.0,
    "energized_raw": "12 MW",
    "speculative_mw": 0.0,
    "speculative_raw": "$20B unverified licensing rumor",
    "regulatory_dockets": [
      "SEC Form 10-Q (NVIDIA Corp Note 14)",
      "Equinix Master Lease"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Adam Winter (CEO Groq)"
    ],
    "delivery_operators": [
      "Jonathan Ross (Founder -> NVIDIA Fellow)"
    ]
  },
  {
    "id": "terawulf-fluidstack-lake-mariner-campus-cb-1-to-cb-5",
    "project_name": "Lake Mariner Campus (CB-1 to CB-5)",
    "company_name": "Fluidstack",
    "company_id": "fluidstack",
    "operational_phase": "Operational / Expanding",
    "energized_mw": 160.0,
    "energized_raw": "160 MW (CB-1/2 operational, CB-5 contracted)",
    "speculative_mw": 340.0,
    "speculative_raw": "340 MW Lake Mariner site ceiling",
    "regulatory_dockets": [
      "SEC Form 10-Q / 8-K",
      "NYISO Zone A Interconnect"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Paul Prager (CEO TeraWulf)",
      "Nazar Yasin (CEO Fluidstack)"
    ],
    "delivery_operators": [
      "Sean Farrell (SVP BD TeraWulf)"
    ]
  },
  {
    "id": "iren-childress-campus-horizon-1-3",
    "project_name": "Childress Campus (Horizon 1-3)",
    "company_name": "IREN",
    "company_id": "iren",
    "operational_phase": "Operational",
    "energized_mw": 350.0,
    "energized_raw": "350 MW (Substations energized)",
    "speculative_mw": 2000.0,
    "speculative_raw": "2,000 MW Sweetwater ERCOT Queue",
    "regulatory_dockets": [
      "SEC Form 20-F",
      "ERCOT Project 54224 Interconnection Study"
    ],
    "category": "AI Compute & Neocloud",
    "accountable_leaders": [
      "Daniel Roberts (Co-CEO)",
      "Will Roberts (Co-CEO)"
    ],
    "delivery_operators": [
      "Belgacem Chariag (COO)",
      "Denis Skrinnikoff (VP Eng)"
    ]
  },
  {
    "id": "coreweave-crawley",
    "project_name": "CoreWeave Crawley",
    "company_name": "Digital Realty (Landlord) / CoreWeave (Tenant)",
    "company_id": "digitalbridge-and-relevant-operating-platforms-unresolved",
    "location": "Crawley, West Sussex, UK",
    "operational_phase": "Contracted / Active",
    "energized_mw": 24.0,
    "energized_raw": "24 MW critical IT load (Phase 1)",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Crawley Borough Council Local Plan CR/2023/0482/FUL",
      "Policies EC1-EC3"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Anthony Caracino (Global Construction)",
      "Paula Cogan (Head of EMEA)"
    ]
  },
  {
    "id": "digital-park-fechenheim",
    "project_name": "Digital Park Fechenheim",
    "company_name": "Digital Realty EMEA / Mainova AG (Heat Off-taker)",
    "company_id": "interxion-digital-realty-emea",
    "location": "Frankfurt am Main, Hesse, Germany",
    "operational_phase": "Contracted / Active",
    "energized_mw": 30.0,
    "energized_raw": "30 MW IT load; 20 MW heat export",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "BGBl. 2023 I Nr. 309 (EnEfG)",
      "RP Darmstadt BImSchG Permits",
      "Mainova Contract"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Volker Ludwig (MD DACH)",
      "Chris Sharp (CTO)"
    ]
  },
  {
    "id": "vantage-frankfurt-ii-fra2-fra21",
    "project_name": "Vantage Frankfurt II (FRA2 / FRA21)",
    "company_name": "Vantage Data Centers EMEA / Syna Grid",
    "company_id": "vantage-data-centers-emea",
    "location": "Raunheim, Hesse, Germany",
    "operational_phase": "Contracted / Active",
    "energized_mw": 40.0,
    "energized_raw": "40 MW IT load energized (Phase 1; 56 MW total)",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Bebauungsplan Nr. 56 der Stadt Raunheim",
      "RP Darmstadt BImSchG 621/4"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "David Howson (President EMEA)",
      "Michael Fr\u00e4nkle (COO EMEA)"
    ]
  },
  {
    "id": "vantage-fra32-backup-generation",
    "project_name": "Vantage FRA32 Backup Generation",
    "company_name": "Vantage Data Centers FRA32 GmbH",
    "company_id": "vantage-data-centers-fra32-gmbh",
    "location": "Raunheim, Hesse, Germany",
    "operational_phase": "Contracted / Active",
    "energized_mw": 154.0,
    "energized_raw": "154 MW fuel thermal capacity (FWL; 20 NDMA gens)",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "RP Darmstadt Bescheid Az. RPDA-Dez. IV/Da 43.18-53e 621/4",
      "BNetzA MaStR"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Michael Fr\u00e4nkle (COO EMEA)",
      "David Howson (President EMEA)"
    ]
  },
  {
    "id": "equinix-xscale-london-ld11x-ld13x",
    "project_name": "Equinix xScale London (LD11x & LD13x)",
    "company_name": "Equinix EMEA / GIC xScale Joint Venture",
    "company_id": "equinix-emea-xscale-jvs",
    "location": "Slough, Berkshire, UK",
    "operational_phase": "Contracted / Active",
    "energized_mw": 20.0,
    "energized_raw": "20 MW critical IT load (LD11x 10 MW; LD13x 10 MW)",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Slough Trading Estate Simplified Planning Zone (SPZ)",
      "SEC 10-Q Note 6"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Bruce Owen (EVP Global Markets; ex-Pres. EMEA)",
      "Raouf Abdel (EVP Ops)"
    ]
  },
  {
    "id": "equinix-xscale-frankfurt-fr9x-fr11x",
    "project_name": "Equinix xScale Frankfurt (FR9x & FR11x)",
    "company_name": "Equinix EMEA / GIC xScale JV / Friesstra\u00dfe",
    "company_id": "equinix-emea-xscale-jvs",
    "location": "Frankfurt am Main, Hesse, Germany",
    "operational_phase": "Contracted / Active",
    "energized_mw": 30.0,
    "energized_raw": "30 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "RP Darmstadt Dezernat IV/Da BImSchG Approvals",
      "SEC Form 10-Q Note 6"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Raouf Abdel (EVP Ops)",
      "Bruce Owen (EVP Global Markets)"
    ]
  },
  {
    "id": "qts-meta-el-paso-campus-phase-i",
    "project_name": "QTS / Meta El Paso Campus Phase I",
    "company_name": "QTS Realty Trust / Wurldwide LLC (Meta) / EPE",
    "company_id": "qts-realty-trust-llc",
    "location": "El Paso, Texas, US",
    "operational_phase": "Contracted / Active",
    "energized_mw": 440.0,
    "energized_raw": "440 MW contracted power ramp",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "PUCT Docket No. 59076 (McCloud 366 MW CCN)",
      "PUCT Docket 56903 (HLFLP)"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "David Robey (Co-CEO)",
      "Tag Greason (Co-CEO)",
      "Lane Anderson (CDO)"
    ]
  },
  {
    "id": "aligned-ashburn-campus-iad01iad02",
    "project_name": "Aligned Ashburn Campus (IAD01/IAD02)",
    "company_name": "Aligned Data Centers / Dominion Energy",
    "company_id": "aligned-data-centers",
    "location": "Ashburn, Virginia, US",
    "operational_phase": "Contracted / Active",
    "energized_mw": 120.0,
    "energized_raw": "120 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Virginia SCC Case Nos. PUR-2022-00045 & PUR-2024-00032",
      "PJM DOM Queue"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Michael Morris (CDO)",
      "Billie Haggard (CFOO)"
    ]
  },
  {
    "id": "aligned-phoenix-campus-phx01",
    "project_name": "Aligned Phoenix Campus (PHX01)",
    "company_name": "Aligned Data Centers / Salt River Project",
    "company_id": "aligned-data-centers",
    "location": "Chandler, Arizona, US",
    "operational_phase": "Contracted / Active",
    "energized_mw": 120.0,
    "energized_raw": "120 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Salt River Project High-Voltage Interconnection Agreement"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Michael Morris (CDO)",
      "Billie Haggard (CFOO)",
      "Earl Keisling (Inventor)"
    ]
  },
  {
    "id": "cyrusone-frankfurt-sossenheim",
    "project_name": "CyrusOne Frankfurt Sossenheim",
    "company_name": "CyrusOne Europe (FRA1-FRA4, FRA6)",
    "company_id": "cyrusone",
    "location": "Frankfurt am Main, Hesse, Germany",
    "operational_phase": "Contracted / Active",
    "energized_mw": 90.0,
    "energized_raw": "90 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "RP Darmstadt Dezernat IV/Da BImSchG Immissionsschutz Permits"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "John Hatem (CEO)",
      "Andreas Paduch (MD Europe)"
    ]
  },
  {
    "id": "cyrusone-dublin-grange-castle-south",
    "project_name": "CyrusOne Dublin (Grange Castle South)",
    "company_name": "CyrusOne Europe / EirGrid",
    "company_id": "cyrusone-europe",
    "location": "Clondalkin, Dublin, Ireland",
    "operational_phase": "Contracted / Active",
    "energized_mw": 45.0,
    "energized_raw": "45 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "An Bord Plean\u00e1la Board Order ABP-302813-18",
      "SDCC Ref. SD18A/0134"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "John Hatem (CEO)",
      "Andreas Paduch (MD Europe)"
    ]
  },
  {
    "id": "stack-americas-northern-virginia",
    "project_name": "STACK Americas Northern Virginia",
    "company_name": "STACK Americas / Dominion Energy Virginia",
    "company_id": "stack-americas",
    "location": "Manassas / Ashburn, Virginia, US",
    "operational_phase": "Contracted / Active",
    "energized_mw": 150.0,
    "energized_raw": "150 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Virginia SCC Case Nos. PUR-2022-00045 & PUR-2025-00058",
      "Prince William SUP"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Matt VanderZanden (CEO Americas)",
      "Mike Casey (COO Americas)"
    ]
  },
  {
    "id": "stack-emea-milan-siziano-campus",
    "project_name": "STACK EMEA Milan Siziano Campus",
    "company_name": "STACK EMEA (former Supernap Italia) / Terna",
    "company_id": "stack-americas",
    "location": "Siziano, Pavia, Italy",
    "operational_phase": "Contracted / Active",
    "energized_mw": 50.0,
    "energized_raw": "50 MW critical IT load",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "Regione Lombardia Regional Law May 2026",
      "Autorizzazione Unica (AU)"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Brian Cox (Interim CEO EMEA)",
      "Mike Casey (COO Americas)"
    ]
  },
  {
    "id": "edgeconnex-dublin-ballymakaily-campus",
    "project_name": "EdgeConneX Dublin Ballymakaily Campus",
    "company_name": "EdgeConneX Inc. / EirGrid / EPA Ireland",
    "company_id": "edgeconnex",
    "location": "Lucan, Dublin, Ireland",
    "operational_phase": "Contracted / Active",
    "energized_mw": 50.0,
    "energized_raw": "50 MW IT load under construction; ~100 MW gas",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "An Bord Plean\u00e1la Appeal Decision (2025)",
      "EPA Ireland Industrial License"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Brian Green (EVP Ops & Eng)",
      "Randy Brouckman (CEO)"
    ]
  },
  {
    "id": "cipher-black-pearl-compute-campus",
    "project_name": "Cipher Black Pearl Compute Campus",
    "company_name": "Cipher Digital Inc. / Amazon Data Services",
    "company_id": "cipher-digital-inc",
    "location": "Wink, Winkler County, Texas, US",
    "operational_phase": "Contracted / Active",
    "energized_mw": 216.0,
    "energized_raw": "216 MW IT load contracted; 300 MW gross",
    "speculative_mw": 0.0,
    "speculative_raw": "0 MW",
    "regulatory_dockets": [
      "SEC Form 8-K/10-Q (15-Yr AWS Lease)",
      "PUCT Oncor Interconnect",
      "ERCOT LFL"
    ],
    "category": "Data Center Infrastructure",
    "accountable_leaders": [],
    "delivery_operators": [
      "Tyler Page (CEO)",
      "VP Electrical Interconnection"
    ]
  }
]